Common problems such as material blocking may occur when the crusher crushes materials. What should I do if the material is blocked?
Solutions
How to Increase the Capacity of Aggregate Plants
As the concrete aggregate market continues to heat up, many quarry operators have begun to consider upgrading aggregate production lines to increase the production capacity of sand and gravel. So how to transform the crushing line with the minimum cost to maximize profit?
6 Ways to Make Mines and Quarries More Sustainable
What are the negative effects of mining and aggregate production on the environment? How can mining and quarrying reduce the environmental impact? This article shares 6 ways to make mines and quarries more sustainable.
450-500 t/h Hard Rock (Granite) Crushing Plant Solution
Raw material from truck falls down to hopper C1 in concrete foundation, the hopper works as buffer to protect feeder F5X1360(A1) from impact force. ,through feeder, material is fed to jaw crusher C6X110(A2).
380-450 t/h Hard Rock (Granite) Crushing Plant Solution
Raw material from truck falls down to hopper C1 in concrete foundation, the hopper works as buffer to protect feeder F5X1360(A1) from impact force, through feeder, material is fed to jaw crusher C6X110(A2).
250-300 T/H Hard Rock (Granite) Crushing Plant Solution
This is a Three-stage crushing plant, for hard stone like granite, maximum feeding size is 720 mm, capacity is 250-300 tph for 0-1/4”-3/8”-3/4”-3/2”(adjustable), from this design.
400-450 T/H Medium Hard Stone (Limestone) Crushing Plant Solution
Firstly, the raw materials(<930 mm) are dumped into the hopper by trucks, and then be fed into the jaw crusher PEW1100 through the vibrating feeder F5X1360 for primary crushing.
300-350 T/H Medium Hard Stone (Limestone) Crushing Plant Solution
Raw material from the truck falls down to hopper LC4x5M(C1), the hopper works as buffer to protect feeder F5X1360(A1) from impact force. Through the feeder, material is fed to Jaw Crusher PEW860(A2), meanwhile the smaller size stone falls down from grizzly bar area in front part of feeder A1, then it is transported by conveyor to vibrating screen S5X1860-2(A7), the vibrating screen A7 separate out clay from mixed material, stone is transported to middle stock pile.
250-300 T/H Medium Hard Stone (Limestone) Crushing Plant Solution
Firstly, the raw materials(<720 mm) are dumped into the hopper by trucks, and then be separated by Vibrating Feeder F5X1360: the bigger raw materials are fed into the Jaw Crusher PEW860 directly, and the smaller are transported to Vibrating Screen S5X1845-2.
200-250 T/H Medium Hard Stone (Limestone) Crushing Plant Solution
Firstly, the raw materials(<640 mm) are dumped into the hopper by trucks, and then be separated by Vibrating Feeder F5X1045: the bigger raw materials are fed into the Jaw Crusher PEW760 directly, and the smaller are transported to Vibrating Screen S5X1545-2.